By Administrator on October 25, 2022
Beginner

Information

HMWS Vision Release Update 2022

SoftwareHMWS VisionVersion5.0.661
Release Date23-OCT-2022Change numberHMWS-VIS-RN-5.0.661

Summary

Work Orders

  1. Overmolded Cable flow has been updated

New Features and Enhancements

Work Orders

Overmolded Cable flow has been updated

https://titus.erpnext.com/app/issue/TKT-00176


The “Overmolded Cable” flow is replaced by the new “Overmolded Cable v02” flow. As such, only the v02 flow can be selected from the list of flows when a work order is being finalized.


Figure 1: Work Order finalize Machining flow


The difference between the old and new flows is that the new flow has 3 additional steps (step 9-11 highlighted below).

  1. Production Engineering
  2. Parts Picking
  3. Wire Cutting
  4. Wire Stripping
  5. Crimping and Soldering
  6. Middle Inspection
  7. Assembly
  8. Circuit Testing 1
  9. Putty Application (Optional)
  10. Shield Soldering (Optional)
  11. High Performance Testing (Optional)
  12. Molding Machine Set-up
  13. Molding
  14. Braiding
  15. Circuit Testing 2  
  16. Final Inspection
  17. Pack and Store
  18. Done


Figure 2: Work order details machining flow



For further information and questions, please contact hmwssupport@titusgt.com